   Baseball Products, Inc.       
           
        Overhead cost allocation  
 BatsGloves ActivityCost ($) ActivityBats ($)Gloves ($)
 Set-ups24 Set-ups 600 Set-ups 200 400
 Machining (hours)150350 Machining 7500 Machining 2250 5250
 Receiving (receipts)3070 Receiving 3000 Receiving 900 2100
 Packing (deliveries)250550 Packing 16000 Packing 5000 11000
 Engineering (hours)400600 Engineering 22000 Engineering 8800 13200
     Total 49100 Total 17150 31950